Finishing facade of residential complex Biruzova 41
The whole complex of works on manufacturing of architectural elements from the manufacture of models and forms to their subsequent casting was made on the facade of a residential building.
Entire scope of work was carried out for 3 months for a total of 1098 pieces of manufactured parts. The composite material GRC (that is sprayed by the methods connected with connected with the process of the stowage of concrete) is used in the the production of parts.
Residential building has 25 floors and 110 meters high at the address Biruzova, 41.